e Completed projects on energy supply for commercial and private facilities

Our projects

 

Some examples of our realized projects are given below

map ozera eng

Objective: Implementation of a ground-based solar power plant project to generate energy at a "green" tariff.

 

Project status: A detailed territory plan is being developed.

malinovka 0

Objective: Implementation of a ground-based solar power plant project in two stages to generate energy at a "green" tariff.

 

Project status: The development of detailed plan of the territory had completed. The design stage started.

osveshhenie-McDonalds Completed projects on energy supply for commercial and private facilities

Objective: Reducing the lighting cost of company's main office. Improve the quality of light and the solution’s environmental friendliness.

 

Solution: 740 LED lamps Opta Т8 PW0053 (9 W, 0.6 m) had installed.

 

Alteco Group functions: Feasibility study calculation, supply, guarantee.

 

Result: The costs of electricity payments decreased more than 2 times. The illuminance level increased. The ecology of rooms has improved. The need for periodical replacement of lamps has disappeared.

nashi_obekty_picture_5 Completed projects on energy supply for commercial and private facilities

Objective: Reducing the cost of company’s facade lighting with the corporate style preservation.

 

Solution: Alteco LS-20 LED spotlights (20 W each) had installed.

 

Alteco Group functions: Feasibility study calculation, supply, guarantee.

 

Result: The costs of electricity payments decreased more than 2 times. The illuminance level increased. The need for periodical replacement of lamps has disappeared.

nashi_obekty_harkov_100kvt-3 Completed projects on energy supply for commercial and private facilities

Objective: Implementation of a business project of a grid-tied solar power plant with connection to the “green” tariff.

 

Solution: Grid-tied solar power plant with a capacity of 100 kW (1-st stage) has mounted, put into operation and connected to the “green” tariff. The next 300 kW solar project (2-nd stage) has developed.

 

Alteco Group functions: Design, supply, installation, warranty.

 

Result: The functioning business project with a daily money flow and a payback period from 5 to 7 years.

 