Task: Implement a network solar station for the sale of generated electricity to the general power grid at a “green” tariff.
Solution: A network inverter Fronius SYMO 15.0-3-M (with the possibility of remote monitoring) and polycrystalline solar panels ABi-Solar CL-P60250 / Perlight Solar PLM250P-60 with a total power of 16.4 kW were installed.
Functions of the Alteco Group company: Design, supply, installation, assistance in registration of a “green” tariff, guarantee.
Result: The solar station was put into operation. The payback period of the project is 6-7 years.
Functions of the Alteco Group company: Design, supply, installation, consultations in connection of the “green” tariff, guarantee.
Result: The station was put into operation, which will generate about 18,200 kWh of clean electricity per year and sell most of it at a “green” tariff of 5.55 UAH/kWh (as of 01.07.2016) and receive income up to UAH 90,000. Additionally, there will be no billing fees at all. The payback period of the project is 6-7 years.
The work of the station can be viewed online at the link: