Objective: Implementation of a rooftop solar power plant project in administrative building with maximum use…
Task: Build a solar station to generate electricity at a “green” tariff.
Solution: 2 network inverters Huawei Sun 2000 – 33KTL-A (with the possibility of remote monitoring) and 276 polycrystalline solar panels JA Solar JAP6-60-270 with a total capacity of 74.52 kW were installed.
Functions of the Alteco Group company: Design, delivery, partial installation, commissioning, warranty.
Result: A solar station with a capacity of 74.5 kW was put into operation. The payback period of the project is 5 years.
solar panels
Task:To build a solar station to generate electricity at a “green” tariff.
Solution: 2 network inverters Huawei Sun 2000 – 33KTL-A (inverter power 30 kW, there is remote monitoring) and 276 polycrystalline solar panels JA Solar JAP6-60-270 with a total capacity of 74.52 kW were installed.
Functions of the Alteco Group company: Design, delivery, partial installation, commissioning, warranty.
Result: A solar station with a capacity of 74.5 kW was put into operation. The payback period of the project is 5 years.
solar module mounting structure
grid inverter 30 kW
Task: To build a solar station for generating energy at a “green” tariff and save…
Objective: Realization of a solar power plant project with PV capacity of 100-110 kW for…
Objective: Implementation of a business project of a grid-tied solar power plant with connection to…
Task: Build a solar station to generate electricity at a “green” tariff. Solution: 2 network…
Task: To design a network solar station for generating energy at a “green” tariff, making…
Task: To build a solar station for generating energy at a “green” tariff and saving…
Task: To build a solar station to save own consumption and generate energy at a…
Task: To implement the project of a rooftop solar power plant for generating energy at…
Task: To implement the project of a rooftop solar power plant for generating energy at…