e Solar power plant 106.9 kW (Dnepropetrovsk region)

Solar power plant 106.9 kW (Dnepropetrovsk region)

 

nikolaevka 1 1nikolaevka 1 2

                           solar plant appearance                                              3D-modeling of PV modules' arrangement

 

 

Objective: Realization of a solar power plant project with PV capacity of 100-110 kW for electricity generation at a "green" tariff.

 

Solution: 3 grid-tied Huawei SUN2000-33KTL inverters (with remote monitoring capability) has installed and 396 polycrystalline solar panels JA Solar JAP6-60-270 with a total capacity of 106.9 kW has mounted.

 

Alteco Group functions: Design, supply, installation, "green" tariff connection, guarantee.

 

Result: The solar power plant 106.9 kW had put into operation and the "green" tariff had registered. The technical and economic characteristics of this solar project allow generating about 107,000 kWh per year of “clean” electricity and receiving a revenue by “green” tariff of about $17,000 per year. Payback period of the project is 5.5 years.

 

 

nikolaevka 2nikolaevka 3

 

 

nikolaevka 4nikolaevka 5

mounting of PV modules

 

 

nikolaevka 6nikolaevka 7

 

 

nikolaevka 8nikolaevka 9

3x30 kW grid-tied inverters (3-phase) and monitoring device

 

 

nikolaevka 10

solar plant’s monitoring in the NetEco system

 

Some Projects

full Solar power plant 106.9 kW (Dnepropetrovsk region)
final Solar power plant 106.9 kW (Dnepropetrovsk region)
novoukr-15 Solar power plant 106.9 kW (Dnepropetrovsk region)