Task: To install a solar station for the sale of generated electricity to the general power grid.
Solution:Schneider Electric Conext CL20000E grid inverter (remote monitoring capability) and Yabang Solar YBP250-60 polycrystalline solar panels with a power of 10.5 kW were installed.
Functions of the Alteco Group company: Design, supply, installation, connection of the “green” tariff, guarantee.
Result: The 1st stage of the solar station (10.5 kW) was put into operation. The payback period of the project is 6-7 years.
Task: Implement a network solar station for the sale of generated electricity to the general power grid at a “green” tariff, with the possibility of a phased increase in the capacity of solar panels up to 20 kW.
Solution:Schneider Electric Conext CL20000E grid inverter and the 1st stage of Yabang Solar YBP250-60 polycrystalline solar panels with a capacity of 10.5 kW were installed. The inverter has the ability to connect to a PC and the Internet for continuous On-line monitoring and reporting.
Functions of the Alteco Group company: Design, supply, installation, connection of the “green” tariff, guarantee.
Result: The 1st stage of the solar station (10.5 kW) was put into operation, which will generate about 11,500 kWh of clean electricity per year and sell most of it at the “green” tariff of 4.89 UAH/kWh (according to as of 12/29/2015). With the introduction of the remaining capacity of 9.5 kW, the station’s output will reach about 22,000 kWh per year, which will make it possible to receive income up to UAH 107,000. The payback period of the project is 6-7 years.
module fixing structure
grid inverter 20 kW (3ph)