Task: Installation of a solar station to compensate for the home’s own consumption and the sale of “surplus” electricity at a “green” tariff.
Solution: The customer was offered to mount a station based on 65 polycrystalline 275-watt JA Solar (Tier-1) solar modules with a total capacity of 17.87 kW and a Huawei SUN2000-17KTL network inverter (17 kW power, 3 MPP trackers, online monitoring capability).
Functions of the Alteco Group company: Design, calculation of generation, 3D-modeling, equipment supply, installation, commissioning, registration of a “green” tariff, guarantee.
Result: A solar station with a capacity of 17.8 kW was put into operation. Solar panels are placed on the roof of the house and over the garage. The estimated payback period of the station is 5.5 years.
solar modules on the roof of the house and hinged ground structure
Task: Installation of a solar station to compensate for the home’s own consumption and the sale of “surplus” electricity at a “green” tariff.
Solution: The customer was offered to mount a station based on 65 polycrystalline 275-watt JA Solar (Tier-1) solar modules with a total capacity of 17.87 kW and a Huawei SUN2000-17KTL network inverter (17 kW power, 3 MPP trackers, online monitoring capability).
Functions of the Alteco Group company: Design, calculation of generation, 3D-modeling, equipment supply, installation, commissioning, registration of a “green” tariff, guarantee.
Result: A solar station with a capacity of 17.8 kW was put into operation. Solar panels are placed on the roof of the house and above the garage. The estimated payback period of the station is 5.5 years. In the future, the Customer plans to increase the capacity of the station by adding a solar field and one more inverter.
ground structure for fixing station
visualization of the location of solar modules and a network inverter 17 kW