Task: To implement a network solar station with a capacity of 22.2 kW, with the placement of panels on the ground, for the sale of electricity at a “green” tariff.
Solution: A three-phase grid inverter Fronius Symo 20.0-3-M (power 20 kW, with a monitoring module) and polycrystalline solar panels Abi Solar P260-60 (total power 22.26 kW) were installed.
Functions of the Alteco Group company: Design, supply, installation, commissioning, registration of a “green” tariff, guarantee.
Result: SPP was put into operation and a “green” tariff was issued. The payback period of the project is about 6-7 years.
Task: To implement a network solar station with a capacity of 20 kW, with the placement of panels on the ground, for the sale of electricity at a “green” tariff.
Solution: A three-phase grid inverter Fronius Symo 20.0-3-M (power 20 kW, with a built-in Wi-Fi module for remote monitoring) and a “field” of polycrystalline solar panels Abi Solar P260-60 (power 22.26 kW) were installed.
Functions of the Alteco Group company: Design, supply, installation, commissioning, registration of a “green” tariff, guarantee.
Result: SPP was put into operation and a “green” tariff was issued. The station will generate a total of about 23,000 kWh of clean electricity per year and sell most of it at the “green” tariff of 5.9 UAH/kWh (as of 30.12.2016, the tariff of 2016), which will generate income up to $ 4,800 per year. The payback period of the project is 6-7 years.