Solar power plant 1.2 MW (Chernihiv dist., Chernihiv region, Ukraine) )

1.2 MW solar power plant construction

Objective: Implementation of a ground-based solar power plant project in two stages to generate energy at a “green” tariff.

Project status: Two stages of solar power plant (600 kW + 600 kW) has put into operation.

Objective: Implementation of a ground-based solar power plant project in two stages 2×600 kW to generate energy at a “green” tariff.

Project status: Two stages of a solar power plant (600 kW + 600 kW) has put into operation.

malinovka 1malinovka 2

design, development of detailed plan of the territory

malinovka 3malinovka 4malinovka 5

solar power plant energy yield calculation

malinovka 8malinovka 7

mounting of the solar structures

malinovka 9malinovka 10

PV modules installation

malinovka 11malinovka 12

malinovka 13malinovka 14

installed rows with PV modules and ITS

malinovka 13malinovka 14

the 1-st stage 600 kW has commissioned

1.2 MW solar power plant construction1.2 MW solar power plant construction

the 2-nd stage 600 kW has commissioned

1.2 MW solar power plant construction

Solar power plant 1.2 MW (2 start-up complexes of 600 kW each)