Objective: Implementation of a business project of a grid-tied solar power plant with connection to the “green” tariff.

Solution: Grid-tied solar power plant with a capacity of 100 kW (1-st stage) has mounted, put into operation and connected to the “green” tariff. The next 300 kW solar project (2-nd stage) has developed.

Alteco Group functions: Design, supply, installation, warranty.

Result: The functioning business project with a daily money flow and a payback period from 5 to 7 years.

Сетевая солнечная станция 100 кВт - 1

Objective: Basing on the financial and area capabilities of the enterprise, to implement a business project of a grid-tied solar power plant with connection to the “green” tariff.

Solution: Grid-tied solar power plant with a capacity of 100 kW (1-st stage) has mounted, put into operation and connected to the “green” tariff. The next 300 kW solar project (2-nd stage) has developed.

Alteco Group functions: Design, supply, installation, warranty.

Result: There is a functioning business project with a daily money flow and a payback period from 5 to 7 years.