Objective: Assessing the feasibility of implementing a 2×75 MW terrestrial solar power plant project with the search for the best variant of connection to the power grid.
Alteco Group functions: Calculation of generation and arrangement of solar power plant, searching for the optimal variant of solar plant connection to the grid.
searching for the optimal variant of solar plant connection
Type of work:
– calculation of generation and arrangement of solar power plant;
– searching for the optimal variant of solar plant connection to the power grid.