Objective: Assessing the feasibility of implementing a 2×75 MW terrestrial solar power plant project with the search for the best variant of connection to the power grid.

Alteco Group functions: Calculation of generation and arrangement of solar power plant, searching for the optimal variant of solar plant connection to the grid.

rustavi 1rustavi 2

searching for the optimal variant of solar plant connection

Type of work:

– calculation of generation and arrangement of solar power plant;

– searching for the optimal variant of solar plant connection to the power grid.