Objective: Implementation of an investment project for construction of a ground-based solar plant with power capacity of 2.4 MW.
Solution: Preliminary analysis of the project has performed.
Alteco Group functions: Technical and economic analysis.
Result: The concept of solar plant project with a payback period of 6.2 years has developed.