The Alteco Group company has launched a new investment project, now in the Ternopil region. The project provides for the construction of a solar power plant with a capacity of 4.6 MW on the territory of Gusiatin district.
Project status: Technical specifications for non-standard connection to electric networks have been received. Measures have been taken to adjust the technical specifications on the basis of technical and economic feasibility. Design and engineering work in progress.
The Alteco Group company has launched a new investment project, now in the Ternopil region. The project provides for the construction of a solar power plant with a capacity of 4.6 MW on the territory of Gusiatin district.
At the moment, the stages have been completed:
– A project implementation concept has been developed;
– A selection and analysis of the land plot has been done;
– Calculated preliminary cost of connection to electric networks;
– The business plan of the project (Executive summary & Feasibility study) was developed and approved;
– Adetailed plan of the territory has been developed;
– Land allocation project had completed;
– Land ownership had registered (rent);
– Technical specifications for non-standard connection to electric networks have been obtained;
– Measures have been taken to adjust the technical specifications on the basis of technical and economic feasibility;
– The collection of initial data for the development of design and estimate documentation has been started;
– Geological research and geodetic work had performed;
– Design and engineering work in progress.
development of a detailed plan of the territory
land allotment design for solar power plant