Skip to content Skip to sidebar Skip to footer

Solar power plant 5.9 MW (Odessa region, Ukraine)

Odessa 59 2

Objective: Assessing the implementation feasibility of a ground-based 5.9 MW solar plant project. Searching for an optimal variant of connection to power grid.

Alteco Group functions: Calculation of generation and arrangement of solar power plant, searching for the optimal variant of solar plant connection to the grid.