Construction of 600 kW solar power plant

Objective: Implementation of acommercial solar power plant project to generate electricity to grid at a “green” tariff.

Project status:Solar power plant has put into operation.

Alteco function: EPC-contractor

Objective: Implementation of acommercial solar power plant project to generate electricity to grid at a “green” tariff.

Project status:Solar power plant has put into operation.

Alteco company acted as the EPC-contractor for this project and performed the following functions:

– Analysis of the existing site of the Customer and 3D modeling of the future SPP;
– Analysis of the previously obtained technical specifications and their correction;
– Drawing up a technical assignment for carrying out geological and geodetic works;
– Drawing up an application for obtaining urban planning conditions and restrictions;
– Development of design and estimate documentation for the SPP (including video surveillance, automation and monitoring systems);
– Development of design and estimate documentation for the connection of the SPP to the Distribution System Operator (DSO) – including sections of relay protection and ASCEM project;
– Preparation of contracts with DSO for connection of the facility;
– Coordination of design and estimate documentation;
– Drawing up technical specifications for manufacturers for the supply of equipment and materials;
– Delivery, quality control, acceptance of equipment and materials at the construction site of the Customer;
– Execution of construction and installation work for SPP;
– Carrying out test works;
– Start-up and commissioning of equipment;
– Obtaining a license for electricity generation in NCSREU;
– Obtaining a “green” tariff in NCSREU;
– Preparation of contracts for the distribution, transmission and metering of electricity with DSO, TSO (Transmission System Operator);
– Preparation of contracts for the purchasing and selling of electricity;
– Obtaining permits for power supply from the competent supervisory authorities;
– Putting into trial operation of the facility;
– Organization of departure of the accounting service for adjustment and sealing of metering devices;
– Commissioning of the SPP into commercial operation;
– Preparation of a package of documents for signing an agreement between the Customer and the SE “Guaranteed Buyer”.

novoukr 1novoukr 2

project design stage

novoukr 1novoukr 2novoukr 2

supply of metal structures

novoukr 1novoukr 2

assembly of metal structures

novoukr 1novoukr 2

novoukr 1

supply and unloading of PV modules

novoukr 1novoukr 2

mounting of PV modules

novoukr 1