Objective: Implementation of acommercial solar power plant project to generate electricity to grid at a “green” tariff.
Project status:Solar power plant has put into operation.
Alteco function: EPC-contractor
Objective: Implementation of acommercial solar power plant project to generate electricity to grid at a “green” tariff.
Project status:Solar power plant has put into operation.
Alteco company acted as the EPC-contractor for this project and performed the following functions:
– Analysis of the existing site of the Customer and 3D modeling of the future SPP;
– Analysis of the previously obtained technical specifications and their correction;
– Drawing up a technical assignment for carrying out geological and geodetic works;
– Drawing up an application for obtaining urban planning conditions and restrictions;
– Development of design and estimate documentation for the SPP (including video surveillance, automation and monitoring systems);
– Development of design and estimate documentation for the connection of the SPP to the Distribution System Operator (DSO) – including sections of relay protection and ASCEM project;
– Preparation of contracts with DSO for connection of the facility;
– Coordination of design and estimate documentation;
– Drawing up technical specifications for manufacturers for the supply of equipment and materials;
– Delivery, quality control, acceptance of equipment and materials at the construction site of the Customer;
– Execution of construction and installation work for SPP;
– Carrying out test works;
– Start-up and commissioning of equipment;
– Obtaining a license for electricity generation in NCSREU;
– Obtaining a “green” tariff in NCSREU;
– Preparation of contracts for the distribution, transmission and metering of electricity with DSO, TSO (Transmission System Operator);
– Preparation of contracts for the purchasing and selling of electricity;
– Obtaining permits for power supply from the competent supervisory authorities;
– Putting into trial operation of the facility;
– Organization of departure of the accounting service for adjustment and sealing of metering devices;
– Commissioning of the SPP into commercial operation;
– Preparation of a package of documents for signing an agreement between the Customer and the SE “Guaranteed Buyer”.
project design stage
supply of metal structures
assembly of metal structures
supply and unloading of PV modules
mounting of PV modules