Objective: Implementation of acommercial solar power plant project to generate energy at a “green” tariff.
Project status:Solar power plant has put into operation.
Alteco function: EPC-contractor
Objective: Implementation of acommercial solar power plant project to generate energy at a “green” tariff.
Project status:Solar power plant has put into operation.
Alteco company acted as the EPC-contractor for this project and performed the following functions:
– Analysis of the existing site of the Customer and 3D modeling of the future SPP;
– Analysis of the previously obtained technical specifications;
– Drawing up a technical assignment for carrying out geological and geodetic works;
– Accompanying the receipt of urban planning conditions and restrictions;
– Development of design and estimate documentation for SPP (including video surveillance and monitoring systems);
– Drawing up technical specifications for manufacturers for the supply of equipment and materials;
– Delivery, quality control, acceptance of equipment and materials at the construction site of the Customer;
– Execution of electrical installation and installation supervision works for SPP;
– Carrying out test works;
– Start-up and commissioning of equipment;
– Obtaining a license for electricity generation in NCSREU;
– Obtaining a “green” tariff in NCSREU;
– Preparation of contracts for the transmission and metering of electricity with SE “Ukrenergo” and the SE “Guaranteed Buyer”;
– Putting into trial operation of the SPP;
– Commissioning of the SPP into commercial operation;
– Preparation of a package of documents for signing an agreement between the Customer and the SE “Guaranteed Buyer”.
preliminary arrangement of modules, visualization
solar power plant project design work
installation of inverters and cable lines layout
installation of solar modules
solar power plant perfectly fits into the urban pattern