Project number for investment: 2133/7
Name: Construction of a solar power plant (SPP) with a capacity of 5.1 MW
Physical location:Ternopil region, Gusyatin district
Site area:8 ha
Estimated SPPgeneration: 5 395 800 kWh per year
Project cost: 4 307 893 Euro
Payback period: about 5 years
Project number for investment: 2247
Name: Construction of a solar power plant (SPP) with a capacity of 7.2 MW
Physical location:Kyiv region, Borodyanka district, Ozera
Site area:12.2 ha
Estimated SPPgeneration: 7 508 880 kWh per year
Project cost: 6 217 820 Euro
Payback period: about 5 years
Project number for investment: 2133/3
Name: Construction of a solar power plant (SPP) with a capacity of 4.6 MW
Physical location:Ternopil region, Gusyatin district, Nyzhbirok
Site area: 8 ha
Estimated SPPgeneration:4 866 800 kWh per year
Project cost: 3 882 882 Euro
Payback period: about 5 years