Basic project parameters

 

Project number for investment: 2133/4

Name: Construction of a solar power plant (SPP) with a capacity of 11.2 MW

Physical location: Ternopil region, Gusyatin district

Site area: 19 ha

Estimated SPP generation: 11 849 600 kWh per year 

Project cost: 9 439 058 Euro

Payback period: about 5 years

 

 