{"id":20536,"date":"2021-08-20T16:40:59","date_gmt":"2021-08-20T13:40:59","guid":{"rendered":"https:\/\/alteco.in.ua\/solar-power-plant-1-2-mw-odessa-region-podolsk\/"},"modified":"2023-12-24T19:11:06","modified_gmt":"2023-12-24T17:11:06","slug":"solar-power-plant-1-2-mw-odessa-region-podolsk","status":"publish","type":"object","link":"https:\/\/alteco.in.ua\/en\/about-us\/all-projects\/solar-power-plant-1-2-mw-odessa-region-podolsk","title":{"rendered":"Solar power plant 1.2 MW (Podilsk, Odessa region, Ukraine)"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\" alignleft size-full wp-image-20521\" title=\"Construction of 1.2 MW solar power plant\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/final.jpg\" alt=\"podolsk 01\" width=\"345\" height=\"259\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/final.jpg 600w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/final-300x225.jpg 300w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/final-370x278.jpg 370w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/final-410x308.jpg 410w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><\/p>\n<p><strong>Objective:<\/strong> Implementation of acommercial solar power plant project to generate energy at a &#8220;green&#8221; tariff.<\/p>\n<p><strong>Project status:<\/strong>Solar power plant has put into operation.<\/p>\n<p><strong>Alteco function:<\/strong> EPC-contractor<\/p>\n<p><!--more--><\/p>\n<p><strong>Objective:<\/strong> Implementation of acommercial solar power plant project to generate energy at a &#8220;green&#8221; tariff.<\/p>\n<p><strong>Project status:<\/strong>Solar power plant has put into operation.<\/p>\n<p><strong>Alteco<\/strong> company acted as the <strong>EPC-contractor<\/strong> for this project and performed the following functions:<\/p>\n<p>&#8211; Analysis of the existing site of the Customer and 3D modeling of the future SPP;<br \/>\n&#8211; Analysis of the previously obtained technical specifications;<br \/>\n&#8211; Drawing up a technical assignment for carrying out geological and geodetic works;<br \/>\n&#8211; Accompanying the receipt of urban planning conditions and restrictions;<br \/>\n&#8211; Development of design and estimate documentation for SPP (including video surveillance and monitoring systems);<br \/>\n&#8211; Drawing up technical specifications for manufacturers for the supply of equipment and materials;<br \/>\n&#8211; Delivery, quality control, acceptance of equipment and materials at the construction site of the Customer;<br \/>\n&#8211; Execution of electrical installation and installation supervision works for SPP;<br \/>\n&#8211; Carrying out test works;<br \/>\n&#8211; Start-up and commissioning of equipment;<br \/>\n&#8211; Obtaining a license for electricity generation in NCSREU;<br \/>\n&#8211; Obtaining a &#8220;green&#8221; tariff in NCSREU;<br \/>\n&#8211; Preparation of contracts for the transmission and metering of electricity with SE &#8220;Ukrenergo&#8221; and the SE &#8220;Guaranteed Buyer&#8221;;<br \/>\n&#8211; Putting into trial operation of the SPP;<br \/>\n&#8211; Commissioning of the SPP into commercial operation;<br \/>\n&#8211; Preparation of a package of documents for signing an agreement between the Customer and the SE &#8220;Guaranteed Buyer&#8221;.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20522\" title=\"Construction of 1.2 MW solar power plant\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-03.jpg\" alt=\"podolsk 03\" width=\"345\" height=\"260\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-03.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-03-300x226.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20523\" title=\"Construction of 1.2 MW solar power plant\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-04.jpg\" alt=\"podolsk 04\" width=\"345\" height=\"260\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-04.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-04-300x226.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><\/p>\n<p>preliminary arrangement of modules, visualization<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20524\" title=\"Construction of 1.2 MW solar power plant\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-01.jpg\" alt=\"podolsk 01\" width=\"345\" height=\"260\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-01.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-01-300x226.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20525\" title=\"Construction of 1.2 MW solar power plant\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-02.jpg\" alt=\"podolsk 02\" width=\"345\" height=\"260\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-02.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-02-300x226.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><\/p>\n<p>solar power plant project design work<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20526\" title=\"Construction of 1.2 MW solar power plant\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-05.jpg\" alt=\"podolsk 01\" width=\"445\" height=\"325\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-05.jpg 445w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-05-300x219.jpg 300w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-05-370x270.jpg 370w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-05-410x299.jpg 410w\" sizes=\"auto, (max-width: 600px) 100vw, 445px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20527\" title=\"Construction of 1.2 MW solar power plant\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-06.jpg\" alt=\"podolsk 02\" width=\"245\" height=\"325\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-06.jpg 245w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-06-226x300.jpg 226w\" sizes=\"auto, (max-width: 245px) 100vw, 245px\" \/><\/p>\n<p>installation of inverters and cable lines layout<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20528\" title=\"Construction of 1.2 MW solar power plant\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-09.jpg\" alt=\"podolsk 01\" width=\"600\" height=\"383\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-09.jpg 600w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-09-300x192.jpg 300w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-09-370x236.jpg 370w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-09-410x262.jpg 410w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20529\" title=\"Construction of 1.2 MW solar power plant\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-10.jpg\" alt=\"podolsk 01\" width=\"600\" height=\"383\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-10.jpg 600w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-10-300x192.jpg 300w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-10-370x236.jpg 370w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/podolsk-10-410x262.jpg 410w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<p>installation of solar modules<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20521\" title=\"Solar power plant 1.2 MW\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/final.jpg\" alt=\"podolsk 01\" width=\"600\" height=\"450\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/final.jpg 600w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/final-300x225.jpg 300w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/final-370x278.jpg 370w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/final-410x308.jpg 410w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20530\" title=\"Solar power plant 1.2 MW\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/final-2.jpg\" alt=\"podolsk 01\" width=\"600\" height=\"450\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/final-2.jpg 600w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/final-2-300x225.jpg 300w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/final-2-370x278.jpg 370w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/final-2-410x308.jpg 410w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<p>solar power plant perfectly fits into the urban pattern<\/p>\n","protected":false},"featured_media":23263,"parent":0,"menu_order":2,"template":"","class_list":["post-20536","object","type-object","status-publish","has-post-thumbnail","hentry"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/object\/20536","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/object"}],"about":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/types\/object"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/media\/23263"}],"wp:attachment":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/media?parent=20536"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}