{"id":20561,"date":"2021-08-17T16:26:00","date_gmt":"2021-08-17T13:26:00","guid":{"rendered":"https:\/\/alteco.in.ua\/solar-power-plant-600-kw-kirovograd-region-novoukrainka\/"},"modified":"2023-11-08T17:15:32","modified_gmt":"2023-11-08T15:15:32","slug":"solar-power-plant-600-kw-kirovograd-region-novoukrainka","status":"publish","type":"object","link":"https:\/\/alteco.in.ua\/en\/about-us\/all-projects\/solar-power-engineering\/solar-power-plant-600-kw-kirovograd-region-novoukrainka","title":{"rendered":"Solar power plant 600 kW (Novoukrainka, Kirovograd region, Ukraine)"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\" alignleft size-full wp-image-20546\" title=\"Construction of 600 kW solar power plant\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-15.jpg\" alt=\"Construction of 600 kW solar power plant\" width=\"345\" height=\"259\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-15.jpg 600w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-15-300x225.jpg 300w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-15-370x278.jpg 370w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-15-410x308.jpg 410w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><\/p>\n<p><strong>Objective:<\/strong> Implementation of acommercial solar power plant project to generate electricity to grid at a &#8220;green&#8221; tariff.<\/p>\n<p><strong>Project status:<\/strong>Solar power plant has put into operation.<\/p>\n<p><strong>Alteco function:<\/strong> EPC-contractor<\/p>\n<p><!--more--><\/p>\n<p><strong>Objective:<\/strong> Implementation of acommercial solar power plant project to generate electricity to grid at a &#8220;green&#8221; tariff.<\/p>\n<p><strong>Project status:<\/strong>Solar power plant has put into operation.<\/p>\n<p><strong>Alteco<\/strong> company acted as the <strong>EPC-contractor<\/strong> for this project and performed the following functions:<\/p>\n<p>&#8211; Analysis of the existing site of the Customer and 3D modeling of the future SPP;<br \/>\n&#8211; Analysis of the previously obtained technical specifications and their correction;<br \/>\n&#8211; Drawing up a technical assignment for carrying out geological and geodetic works;<br \/>\n&#8211; Drawing up an application for obtaining urban planning conditions and restrictions;<br \/>\n&#8211; Development of design and estimate documentation for the SPP (including video surveillance, automation and monitoring systems);<br \/>\n&#8211; Development of design and estimate documentation for the connection of the SPP to the Distribution System Operator (DSO) &#8211; including sections of relay protection and ASCEM project;<br \/>\n&#8211; Preparation of contracts with DSO for connection of the facility;<br \/>\n&#8211; Coordination of design and estimate documentation;<br \/>\n&#8211; Drawing up technical specifications for manufacturers for the supply of equipment and materials;<br \/>\n&#8211; Delivery, quality control, acceptance of equipment and materials at the construction site of the Customer;<br \/>\n&#8211; Execution of construction and installation work for SPP;<br \/>\n&#8211; Carrying out test works;<br \/>\n&#8211; Start-up and commissioning of equipment;<br \/>\n&#8211; Obtaining a license for electricity generation in NCSREU;<br \/>\n&#8211; Obtaining a &#8220;green&#8221; tariff in NCSREU;<br \/>\n&#8211; Preparation of contracts for the distribution, transmission and metering of electricity with DSO, TSO (Transmission System Operator);<br \/>\n&#8211; Preparation of contracts for the purchasing and selling of electricity;<br \/>\n&#8211; Obtaining permits for power supply from the competent supervisory authorities;<br \/>\n&#8211; Putting into trial operation of the facility;<br \/>\n&#8211; Organization of departure of the accounting service for adjustment and sealing of metering devices;<br \/>\n&#8211; Commissioning of the SPP into commercial operation;<br \/>\n&#8211; Preparation of a package of documents for signing an agreement between the Customer and the SE &#8220;Guaranteed Buyer&#8221;.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20547\" title=\"Construction of 600 kW solar power plant\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-1.jpg\" alt=\"novoukr 1\" width=\"345\" height=\"227\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-1.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-1-300x197.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20548\" title=\"Construction of 600 kW solar power plant\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-2.jpg\" alt=\"novoukr 2\" width=\"345\" height=\"227\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-2.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-2-300x197.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><\/p>\n<p>project design stage<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20549\" title=\"Construction of 600 kW solar power plant\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-3.jpg\" alt=\"novoukr 1\" width=\"230\" height=\"307\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-3.jpg 230w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-3-225x300.jpg 225w\" sizes=\"auto, (max-width: 230px) 100vw, 230px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20550\" title=\"Construction of 600 kW solar power plant\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-4.jpg\" alt=\"novoukr 2\" width=\"230\" height=\"307\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-4.jpg 230w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-4-225x300.jpg 225w\" sizes=\"auto, (max-width: 230px) 100vw, 230px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20551\" title=\"Construction of 600 kW solar power plant\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-5.jpg\" alt=\"novoukr 2\" width=\"230\" height=\"307\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-5.jpg 230w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-5-225x300.jpg 225w\" sizes=\"auto, (max-width: 230px) 100vw, 230px\" \/><\/p>\n<p>supply of metal structures<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20552\" title=\"Construction of 600 kW solar power plant\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-7.jpg\" alt=\"novoukr 1\" width=\"440\" height=\"330\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-7.jpg 440w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-7-300x225.jpg 300w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-7-370x278.jpg 370w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-7-410x308.jpg 410w\" sizes=\"auto, (max-width: 600px) 100vw, 440px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20553\" title=\"Construction of 600 kW solar power plant\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-8.jpg\" alt=\"novoukr 2\" width=\"250\" height=\"330\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-8.jpg 250w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-8-227x300.jpg 227w\" sizes=\"auto, (max-width: 250px) 100vw, 250px\" \/><\/p>\n<p>assembly of metal structures<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20554\" title=\"Construction of 600 kW solar power plant\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-9.jpg\" alt=\"novoukr 1\" width=\"345\" height=\"229\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-9.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-9-300x199.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20555\" title=\"Construction of 600 kW solar power plant\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-10.jpg\" alt=\"novoukr 2\" width=\"345\" height=\"229\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-10.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-10-300x199.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20556\" title=\"Construction of 600 kW solar power plant\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-11.jpg\" alt=\"novoukr 1\" width=\"600\" height=\"398\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-11.jpg 600w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-11-300x199.jpg 300w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-11-370x245.jpg 370w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-11-410x272.jpg 410w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<p>supply and unloading of PV modules<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20557\" title=\"Construction of 600 kW solar power plant\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-12.jpg\" alt=\"novoukr 1\" width=\"440\" height=\"330\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-12.jpg 440w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-12-300x225.jpg 300w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-12-370x278.jpg 370w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-12-410x308.jpg 410w\" sizes=\"auto, (max-width: 600px) 100vw, 440px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20558\" title=\"Construction of 600 kW solar power plant\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-13.jpg\" alt=\"novoukr 2\" width=\"250\" height=\"330\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-13.jpg 250w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-13-227x300.jpg 227w\" sizes=\"auto, (max-width: 250px) 100vw, 250px\" \/><\/p>\n<p>mounting of PV modules<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20559\" title=\"Construction of 600 kW solar power plant\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-14.jpg\" alt=\"novoukr 1\" width=\"600\" height=\"450\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-14.jpg 600w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-14-300x225.jpg 300w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-14-370x278.jpg 370w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-14-410x308.jpg 410w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20546\" title=\"Construction of 600 kW solar power plant\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-15.jpg\" alt=\"novoukr 1\" width=\"600\" height=\"450\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-15.jpg 600w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-15-300x225.jpg 300w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-15-370x278.jpg 370w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/08\/novoukr-15-410x308.jpg 410w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n","protected":false},"featured_media":23303,"parent":140261,"menu_order":4,"template":"","class_list":["post-20561","object","type-object","status-publish","has-post-thumbnail","hentry"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/object\/20561","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/object"}],"about":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/types\/object"}],"up":[{"embeddable":true,"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/object\/140261"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/media\/23303"}],"wp:attachment":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/media?parent=20561"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}