{"id":20744,"date":"2021-05-05T13:08:57","date_gmt":"2021-05-05T10:08:57","guid":{"rendered":"https:\/\/alteco.in.ua\/on-grid-solar-power-plant-20-kw-kyiv-region-559\/"},"modified":"2023-04-18T17:33:20","modified_gmt":"2023-04-18T14:33:20","slug":"on-grid-solar-power-plant-20-kw-kyiv-region-559","status":"publish","type":"object","link":"https:\/\/alteco.in.ua\/en\/about-us\/all-projects\/solar-power-engineering\/on-grid-solar-power-plant-20-kw-kyiv-region-559","title":{"rendered":"On-grid solar power plant 20 kW (Kyiv region, Ukraine)"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\" alignleft size-full wp-image-20593\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/kozin-1.jpg\" alt=\"\u0421\u043e\u043b\u043d\u0435\u0447\u043d\u0430\u044f \u044d\u043b\u0435\u043a\u0442\u0440\u043e\u0441\u0442\u0430\u043d\u0446\u0438\u044f 20 \u043a\u0412\u0442\" width=\"345\" height=\"259\" title=\"On-grid solar power plant 20 kW\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/kozin-1.jpg 600w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/kozin-1-300x225.jpg 300w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/kozin-1-370x278.jpg 370w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/kozin-1-410x308.jpg 410w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><\/p>\n<p><strong>Task:<\/strong> To implement the project of a rooftop solar power plant for generating energy at a &#8220;green&#8221; tariff.<\/p>\n<p><strong>Solution:<\/strong>At first, <strong>40 pcs<\/strong> of monocrystalline <strong>half-cell<\/strong> solar modules <strong>Risen-330W<\/strong> with a power of <strong>13.2 kW<\/strong> and a network inverter <strong>Huawei SUN2000-20KTL-M0<\/strong> (AC power 20 kW, 3 phases + online monitoring) were installed. Then another 20 pcs of <strong>JA Solar JAM60S10-340\/MR<\/strong> mono <strong>half-cell<\/strong> module with a power of <strong>6.8 kW<\/strong> were added.<\/p>\n<p><strong>Functions of the Alteco company:<\/strong> Design, supply, installation, commissioning, warranty.<\/p>\n<p><strong>Result:<\/strong> A solar station with a capacity of <strong>20 kW<\/strong> was put into operation. The payback period of the project is up to <strong>6 years<\/strong>.<\/p>\n<p><!--more--><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20593\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/kozin-1.jpg\" alt=\"\u0421\u043e\u043b\u043d\u0435\u0447\u043d\u0430\u044f \u044d\u043b\u0435\u043a\u0442\u0440\u043e\u0441\u0442\u0430\u043d\u0446\u0438\u044f 20 \u043a\u0412\u0442\" width=\"600\" height=\"450\" title=\"On-grid solar power plant 20 kW\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/kozin-1.jpg 600w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/kozin-1-300x225.jpg 300w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/kozin-1-370x278.jpg 370w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/kozin-1-410x308.jpg 410w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<p><strong>Task:<\/strong> To implement the project of a rooftop solar power plant for generating energy at a &#8220;green&#8221; tariff.<\/p>\n<p><strong>Solution:<\/strong>At first, <strong>40 pcs<\/strong> of monocrystalline <strong>half-cell<\/strong> solar modules <strong>Risen-330W<\/strong> with a power of <strong>13.2 kW<\/strong> and a network inverter <strong>Huawei SUN2000-20KTL-M0<\/strong> (AC power 20 kW, 3 phases + online monitoring) were installed. Then another 20 pcs of <strong>JA Solar JAM60S10-340\/MR<\/strong> mono <strong>half-cell<\/strong> module with a power of <strong>6.8 kW<\/strong> were added.<\/p>\n<p><strong>Functions of the Alteco company:<\/strong> Design, supply, installation, commissioning, warranty.<\/p>\n<p><strong>Result:<\/strong> A solar station with a capacity of <strong>20 kW<\/strong> was put into operation. The payback period of the project is up to <strong>6 years<\/strong>.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20623\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/kozin-2.jpg\" alt=\"\u0421\u043e\u043b\u043d\u0435\u0447\u043d\u0430\u044f \u044d\u043b\u0435\u043a\u0442\u0440\u043e\u0441\u0442\u0430\u043d\u0446\u0438\u044f 20 \u043a\u0412\u0442\" width=\"323\" height=\"430\" title=\"On-grid solar power plant 20 kW\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/kozin-2.jpg 400w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/kozin-2-225x300.jpg 225w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/kozin-2-370x493.jpg 370w\" sizes=\"auto, (max-width: 600px) 100vw, 323px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20595\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/inverter-20ktl-m0.jpg\" alt=\"\u0421\u0435\u0442\u0435\u0432\u043e\u0439 \u0438\u043d\u0432\u0435\u0440\u0442\u043e\u0440 20 \u043a\u0412\u0442\" width=\"344\" height=\"430\" title=\"On-grid solar power plant 20 kW\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/inverter-20ktl-m0.jpg 500w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/inverter-20ktl-m0-240x300.jpg 240w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/inverter-20ktl-m0-370x463.jpg 370w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/inverter-20ktl-m0-410x513.jpg 410w\" sizes=\"auto, (max-width: 600px) 100vw, 344px\" \/><\/p>\n<p>The panels on the roof and Huawei inverter<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20624\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/kozin-3.jpg\" alt=\"\u0421\u043e\u043b\u043d\u0435\u0447\u043d\u0430\u044f \u044d\u043b\u0435\u043a\u0442\u0440\u043e\u0441\u0442\u0430\u043d\u0446\u0438\u044f 20 \u043a\u0412\u0442\" width=\"600\" height=\"450\" title=\"On-grid solar power plant 20 kW\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/kozin-3.jpg 600w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/kozin-3-300x225.jpg 300w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/kozin-3-370x278.jpg 370w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/kozin-3-410x308.jpg 410w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<p>Roof mounting structure with raisedangle<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20597\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/naves.jpg\" alt=\"\u041c\u043e\u043d\u0442\u0430\u0436 \u043d\u0430\u0432\u0435\u0441\u043d\u043e\u0439 \u043a\u043e\u043d\u0441\u0442\u0440\u0443\u043a\u0446\u0438\u0438\" width=\"600\" height=\"450\" title=\"Installation of a hinged structure\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/naves.jpg 600w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/naves-300x225.jpg 300w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/naves-370x278.jpg 370w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/naves-410x308.jpg 410w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<p>Installation of a hinged structure<\/p>\n","protected":false},"featured_media":23381,"parent":140261,"menu_order":17,"template":"","class_list":["post-20744","object","type-object","status-publish","has-post-thumbnail","hentry"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/object\/20744","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/object"}],"about":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/types\/object"}],"up":[{"embeddable":true,"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/object\/140261"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/media\/23381"}],"wp:attachment":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/media?parent=20744"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}