{"id":20751,"date":"2021-07-23T17:59:08","date_gmt":"2021-07-23T14:59:08","guid":{"rendered":"https:\/\/alteco.in.ua\/solar-power-plant-2-mw-kazakhstan-turkestan-region-563\/"},"modified":"2023-04-18T14:10:50","modified_gmt":"2023-04-18T11:10:50","slug":"solar-power-plant-2-mw-kazakhstan-turkestan-region-563","status":"publish","type":"object","link":"https:\/\/alteco.in.ua\/en\/about-us\/all-projects\/solar-power-plant-2-mw-kazakhstan-turkestan-region-563","title":{"rendered":"Solar power plant 2 MW (Kazakhstan, Turkestan region)"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\" alignleft size-full wp-image-20618\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/kargaly-1.jpg\" alt=\"\u0421\u0442\u0440\u043e\u0438\u0442\u0435\u043b\u044c\u0441\u0442\u0432\u043e \u0441\u043e\u043b\u043d\u0435\u0447\u043d\u043e\u0439 \u0441\u0442\u0430\u043d\u0446\u0438\u0438 2 \u041c\u0412\u0442\" width=\"345\" height=\"259\" title=\"Construction of solar power plant 2 MW\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/kargaly-1.jpg 639w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/kargaly-1-600x451.jpg 600w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/kargaly-1-300x225.jpg 300w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/kargaly-1-370x278.jpg 370w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/kargaly-1-410x308.jpg 410w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><\/p>\n<p>The <strong>Alteco Group company<\/strong> has launched a project of a solar power plant with a capacity of <strong>2 MW<\/strong> in the Turkestan region of the Republic of Kazakhstan.<\/p>\n<p><strong>Object status:<\/strong> Land acquisition of the site has been completed. Technical specifications for non-standard connection to power grids were received. Measures were taken to adjust the technical specifications based on the technical and economic feasibility. Design work has begun.<\/p>\n<p><!--more--><\/p>\n<p>The <strong>Alteco Group<\/strong> company has launched an investment project in the Republic of Kazakhstan. The project provides for the construction of a solar power plant with a capacity of <strong>2 MW<\/strong> in the territory of the Turkestan region.<\/p>\n<p><strong>At the moment, the stages have already been passed:<\/strong><\/p>\n<p>&#8211; The concept of project implementation has been developed;<br \/>\n&#8211; Selection and analysis of the land plot;<br \/>\n&#8211; The preliminary cost of connection to electric networks has been calculated;<br \/>\n&#8211; Land allocation project completed;<br \/>\n&#8211; Legalized ownership (lease);<br \/>\n&#8211; Technical specifications for non-standard connection to power grids were received;<br \/>\n&#8211; Collected initial data for the development of design and estimate documentation;<br \/>\n&#8211; The implementation of geological surveys and geodetic works has begun.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20619\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/kargaly-shema.jpg\" alt=\"\u0421\u0442\u0440\u043e\u0438\u0442\u0435\u043b\u044c\u0441\u0442\u0432\u043e \u0441\u043e\u043b\u043d\u0435\u0447\u043d\u043e\u0439 \u0441\u0442\u0430\u043d\u0446\u0438\u0438 2 \u041c\u0412\u0442\" width=\"300\" height=\"451\" title=\"Construction of solar power plant 2 MW\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/kargaly-shema.jpg 300w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/kargaly-shema-200x300.jpg 200w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p><span>preliminary territory for SPP placement<\/span><\/p>\n","protected":false},"featured_media":20618,"parent":0,"menu_order":30,"template":"","class_list":["post-20751","object","type-object","status-publish","has-post-thumbnail","hentry"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/object\/20751","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/object"}],"about":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/types\/object"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/media\/20618"}],"wp:attachment":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/media?parent=20751"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}