{"id":20754,"date":"2021-05-27T18:26:27","date_gmt":"2021-05-27T15:26:27","guid":{"rendered":"https:\/\/alteco.in.ua\/on-grid-solar-station-34-3-kw-novomoskovskyi-district-dnipropetrovsk-region-ukraine-566\/"},"modified":"2023-04-18T17:06:45","modified_gmt":"2023-04-18T14:06:45","slug":"on-grid-solar-station-34-3-kw-novomoskovskyi-district-dnipropetrovsk-region-ukraine-566","status":"publish","type":"object","link":"https:\/\/alteco.in.ua\/en\/about-us\/all-projects\/on-grid-solar-station-34-3-kw-novomoskovskyi-district-dnipropetrovsk-region-ukraine-566","title":{"rendered":"On-grid solar station 34.3 kW (Novomoskovskyi district, Dnipropetrovsk region, Ukraine)"},"content":{"rendered":"<p><strong>Task:<\/strong> To design a network solar station for generating energy at a &#8220;green&#8221; tariff, making the most of the roof area.<\/p>\n<p><strong>Solution:<\/strong> Installed 132 polycrystalline<strong> 260<\/strong>-watt solar modules with a capacity of 34.32 kW and a network inverter <strong>Huawei SUN 2000 &#8211; 33KTL<\/strong> (power 30 kW, 3 MPP trackers, the ability of online monitoring).<\/p>\n<p><strong>Functions of the Alteco Group company:<\/strong> Design, 3D-modeling, delivery, installation, commissioning, registration of a &#8220;green&#8221; tariff, warranty.<\/p>\n<p><strong>Result:<\/strong> A solar station with a capacity of 34.3 kW was put into operation. The payback period of the project is 5 years.<\/p>\n<p><!--more--><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20419\" title=\"On-grid solar station 34.3 kW \" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/solar-panels-1.jpg\" alt=\"solar panels 1\" width=\"345\" height=\"230\"><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20420\" title=\"On-grid solar station 34.3 kW \" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/solar-panels-2.jpg\" alt=\"solar panels 2\" width=\"345\" height=\"230\"><\/p>\n<p>exterior of a house with a &#8220;solar&#8221; roof<\/p>\n<p><strong>Task:<\/strong> To design a network solar station for generating energy at a &#8220;green&#8221; tariff, making the most of the roof area.<\/p>\n<p><strong>Solution:<\/strong> Installed 132 polycrystalline <strong>260<\/strong>-watt solar modules with a capacity of 34.32 kW and a network inverter <a href=%\"\/product%s\/solnechnue-batarei\/invertory\/setevye-invertory\/huawei-sun-2000-33kt-detail\"><strong>Huawei SUN 2000 &#8211; 33KTL<\/strong><\/a> (power 30 kW, 3 MPP trackers, the ability of online monitoring).<\/p>\n<p><strong>Functions of the Alteco Group company:<\/strong> Calculation of the station&#8217;s performance, 3D-modeling of the location of solar panels, calculation of shading of photo modules, supply of equipment and fasteners, commissioning of the station, warranty.<\/p>\n<p><strong>Result:<\/strong> The carried out work on 3D-modeling and design made it possible to maximally occupy the roof area with solar panels. Taking into account the peculiarities of the object, our specialists came to the conclusion that the solar station should be divided into 3 fields.Two fields (28.6 kW) are located on the slopes of the roof of the house and garage, the remaining field (5.72 kW) was placed along the fence.The used 30 kW inverter with 3 MPPT inputs made it possible to extract the maximum performance from the solar station. The calculation of the station generation and shading was carried out using special software.The result obtained fully justifies the expended efforts of Alteco&#8217;s specialists and meets the expectations of the Customer.A solar station with a capacity of 34.3 kW was put into operation. The payback period of the project is 5 years.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20428\" title=\"On-grid solar station 34.3 kW \" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-panels-3.jpg\" alt=\"solar panels 3\" width=\"345\" height=\"259\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-panels-3.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-panels-3-300x225.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20429\" title=\"On-grid solar station 34.3 kW \" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-panels-4.jpg\" alt=\"solar panels 4\" width=\"345\" height=\"259\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-panels-4.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-panels-4-300x225.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><\/p>\n<p>solar panels on other roof slopes<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20430\" title=\"PV module design along the fence\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-panels-fence.jpg\" alt=\"solar panels fence\" width=\"450\" height=\"290\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-panels-fence.jpg 450w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-panels-fence-300x193.jpg 300w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-panels-fence-370x238.jpg 370w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-panels-fence-410x264.jpg 410w\" sizes=\"auto, (max-width: 600px) 100vw, 450px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20410\" title=\"Grid inverter 30 kW\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/solar-inverter.jpg\" alt=\"solar inverter\" width=\"240\" height=\"290\"><\/p>\n<p>PV module design along the fence and grid inverter 30 kW<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20431\" title=\"Solar power plant installation\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-panels-installation-1.jpg\" alt=\"solar panels installation 1\" width=\"345\" height=\"258\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-panels-installation-1.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-panels-installation-1-300x224.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20432\" title=\"Solar power plant installation\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-panels-installation-2.jpg\" alt=\"solar panels installation 2\" width=\"345\" height=\"259\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-panels-installation-2.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-panels-installation-2-300x225.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><\/p>\n<p>installation of panels on the roof of the house<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20433\" title=\"3D modeling of the location of solar modules\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-modelling-1.jpg\" alt=\"solar modelling 1\" width=\"345\" height=\"225\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-modelling-1.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-modelling-1-300x196.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20434\" title=\"3D modeling of the location of solar modules\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-modelling-2.jpg\" alt=\"solar modelling 2\" width=\"345\" height=\"225\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-modelling-2.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-modelling-2-300x196.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20435\" title=\"3D modeling of the location of solar modules\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-modelling-3.jpg\" alt=\"solar modelling 3\" width=\"345\" height=\"225\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-modelling-3.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-modelling-3-300x196.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20436\" title=\"3D modeling of the location of solar modules\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-modelling-4.jpg\" alt=\"solar modelling 4\" width=\"345\" height=\"225\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-modelling-4.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-modelling-4-300x196.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><\/p>\n<p>3D modeling of the location of solar modules<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20437\" title=\"switching circuits of solar station\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-sheme-1.jpg\" alt=\"solar sheme 1\" width=\"345\" height=\"235\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-sheme-1.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-sheme-1-300x204.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20438\" title=\"switching circuits of solar station\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-sheme-2.jpg\" alt=\"solar sheme 2\" width=\"345\" height=\"235\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-sheme-2.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/solar-sheme-2-300x204.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><\/p>\n<p>switching circuits of solar station<\/p>\n","protected":false},"featured_media":20418,"parent":0,"menu_order":6,"template":"","class_list":["post-20754","object","type-object","status-publish","has-post-thumbnail","hentry"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/object\/20754","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/object"}],"about":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/types\/object"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/media\/20418"}],"wp:attachment":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/media?parent=20754"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}