{"id":20756,"date":"2021-04-05T12:25:54","date_gmt":"2021-04-05T09:25:54","guid":{"rendered":"https:\/\/alteco.in.ua\/on-grid-solar-station-16-2-kw-vasylkivskyi-district-kyiv-region-ukraine-568\/"},"modified":"2024-10-31T17:30:30","modified_gmt":"2024-10-31T15:30:30","slug":"on-grid-solar-station-16-2-kw-vasylkivskyi-district-kyiv-region-ukraine-568","status":"publish","type":"object","link":"https:\/\/alteco.in.ua\/en\/about-us\/all-projects\/on-grid-solar-station-16-2-kw-vasylkivskyi-district-kyiv-region-ukraine-568","title":{"rendered":"On-grid solar station 16.2 kW (Vasylkivskyi district, Kyiv region, Ukraine)"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\" alignleft size-full wp-image-20418\" title=\"On-grid solar station 16.2 kW\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/solar-panels-main.jpg\" alt=\"solar panels main\" width=\"345\" height=\"252\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/solar-panels-main.jpg 315w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/solar-panels-main-300x219.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><\/p>\n<p><strong>Task:<\/strong> Based on the customer&#8217;s available space, to build a solar station for generating energy at a &#8220;green&#8221; tariff and saving own consumption.<\/p>\n<p><strong>Solution:<\/strong> Installed 60 polycrystalline solar panels <strong>JA Solar JAP6-60-270<\/strong> with a capacity of 16.2 kW and a grid inverter <strong>Fronius Symo 15.0-3-M<\/strong> (power 15 kW, with online monitoring output).<\/p>\n<p><strong>Functions of the Alteco Group company<\/strong>: Design, 3D-modeling, delivery, installation, commissioning, registration of a &#8220;green&#8221; tariff, warranty.<\/p>\n<p><strong>Result:<\/strong> A solar station with a capacity of 16.2 kW was put into operation. The payback period of the project is 6 years.<\/p>\n<p><!--more--><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20419\" title=\"On-grid solar station 16.2 kW\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/solar-panels-1.jpg\" alt=\"solar panels 1\" width=\"345\" height=\"259\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/solar-panels-1.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/solar-panels-1-300x225.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20420\" title=\"On-grid solar station 16.2 kW\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/solar-panels-2.jpg\" alt=\"solar panels 2\" width=\"345\" height=\"259\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/solar-panels-2.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/solar-panels-2-300x225.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><\/p>\n<p>appearance of the solar station<\/p>\n<p><strong>Task:<\/strong> Based on the customer&#8217;s available space, to build a solar station for generating energy at a &#8220;green&#8221; tariff and saving own consumption.<\/p>\n<p><strong>Solution:<\/strong> After the analysis, a decision was made on the ground location of the solar station, since the available roof area did not allow to place the solar panels in full.Installed 60 polycrystalline solar panels <strong>JA Solar JAP6-60-270<\/strong> with a capacity of 16.2 kW and a grid inverter <strong>Fronius Symo 15.0-3-M<\/strong> (power 15 kW, with online monitoring output).The ground structure is made in the form of a single &#8220;table&#8221; with four rows of landscape-oriented solar modules.This arrangement of the panels made it possible to save a little on the area occupied by PV modules with a metal structure.<\/p>\n<p><strong>Functions of the Alteco Group company:<\/strong> Design, 3D modeling of shading and panel arrangement, calculation of station generation, supply, installation, commissioning, registration of a &#8220;green&#8221; tariff, warranty.<\/p>\n<p><strong>Result:<\/strong> The solar station was put into operation. The &#8220;green&#8221; tariff has been successfully issued and connected. The payback period of the project is 6 years.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20387\" title=\"On-grid solar station 16.2 kW\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/solar-construction-1.jpg\" alt=\"solar construction 1\" width=\"345\" height=\"259\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20388\" title=\"On-grid solar station 16.2 kW\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/solar-construction-2.jpg\" alt=\"solar construction 2\" width=\"345\" height=\"259\" \/><\/p>\n<p>metal structure for mounting solar modules<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20391\" title=\"Grid inverter 15 kW\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/solar-inverter-2.jpg\" alt=\"solar inverter 2\" width=\"200\" height=\"285\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20390\" title=\"Grid inverter 15 kW\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/solar-inverter-1.jpg\" alt=\"solar inverter 1\" width=\"275\" height=\"285\" \/><\/p>\n<p>installed grid inverter 15 kW<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20421\" title=\"3D modeling of a solar station\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/3d-modelling-1.jpg\" alt=\"3d modelling 1\" width=\"345\" height=\"235\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/3d-modelling-1.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/3d-modelling-1-300x204.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20422\" title=\"3D modeling of a solar station\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/3d-modelling-2.jpg\" alt=\"3d modelling 2\" width=\"345\" height=\"235\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/3d-modelling-2.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/3d-modelling-2-300x204.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><\/p>\n<p>3D modeling of a solar station<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20423\" title=\"Placing of solar modules\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/visualization-1.jpg\" alt=\"visualization 1\" width=\"345\" height=\"260\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/visualization-1.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/visualization-1-300x226.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20424\" title=\"Placing of solar modules\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/visualization-2.jpg\" alt=\"visualization 2\" width=\"345\" height=\"260\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/visualization-2.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/visualization-2-300x226.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><\/p>\n<p>options for placing solar modules<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20425\" title=\"Schedule of solar station generation\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/ivankovichi-solar-web-day.jpg\" alt=\"ivankovichi solar web day\" width=\"345\" height=\"209\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/ivankovichi-solar-web-day.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/ivankovichi-solar-web-day-300x182.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20426\" title=\"Schedule of solar station generation\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/ivankovichi-solar-web-month.jpg\" alt=\"ivankovichi solar web month\" width=\"345\" height=\"209\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/ivankovichi-solar-web-month.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/04\/ivankovichi-solar-web-month-300x182.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><\/p>\n<p>schedules of solar station generation<\/p>\n","protected":false},"featured_media":20418,"parent":0,"menu_order":38,"template":"","class_list":["post-20756","object","type-object","status-publish","has-post-thumbnail","hentry"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/object\/20756","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/object"}],"about":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/types\/object"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/media\/20418"}],"wp:attachment":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/media?parent=20756"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}