{"id":20758,"date":"2021-06-10T12:43:43","date_gmt":"2021-06-10T09:43:43","guid":{"rendered":"https:\/\/alteco.in.ua\/on-grid-solar-station-74-5-kw-dnipropetrovsk-region-ukraine-570\/"},"modified":"2023-04-18T15:27:21","modified_gmt":"2023-04-18T12:27:21","slug":"on-grid-solar-station-74-5-kw-dnipropetrovsk-region-ukraine-570","status":"publish","type":"object","link":"https:\/\/alteco.in.ua\/en\/about-us\/all-projects\/solar-power-engineering\/on-grid-solar-station-74-5-kw-dnipropetrovsk-region-ukraine-570","title":{"rendered":"On-grid solar station 74.5 kW (Dnipropetrovsk region, Ukraine)"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\" alignleft size-full wp-image-20384\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/solar-station-main.jpg\" alt=\"solar station main\" width=\"345\" height=\"235\" title=\"Solar power plant 74,5 kW\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/solar-station-main.jpg 315w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/solar-station-main-300x205.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><\/p>\n<p><strong>Task:<\/strong> Build a solar station to generate electricity at a &#8220;green&#8221; tariff.<\/p>\n<p><strong>Solution:<\/strong> 2 network inverters <strong>Huawei Sun 2000 &#8211; 33KTL-A<\/strong> (with the possibility of remote monitoring) and 276 polycrystalline solar panels <strong>JA Solar JAP6-60-270<\/strong> with a total capacity of 74.52 kW were installed.<\/p>\n<p><strong>Functions of the Alteco Group company:<\/strong> Design, delivery, partial installation, commissioning, warranty.<\/p>\n<p><strong>Result:<\/strong> A solar station with a capacity of 74.5 kW was put into operation. The payback period of the project is 5 years.<\/p>\n<p><!--more--><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20385\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/solar-station-1.jpg\" alt=\"solar station 1\" width=\"345\" height=\"235\" title=\"Solar power plant 74,5 kW\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/solar-station-1.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/solar-station-1-300x204.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20386\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/solar-station-2.jpg\" alt=\"solar station 2\" width=\"345\" height=\"235\" title=\"Solar power plant 74,5 kW\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/solar-station-2.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/solar-station-2-300x204.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><\/p>\n<p><span>solar panels<\/span><\/p>\n<p><strong>Task:<\/strong>To build a solar station to generate electricity at a &#8220;green&#8221; tariff.<\/p>\n<p><strong>Solution:<\/strong> 2 network inverters <strong>Huawei Sun 2000 &#8211; 33KTL-A<\/strong> (inverter power 30 kW, there is remote monitoring) and 276 polycrystalline solar panels <a href=%\"\/product%s\/solnechnue-batarei\/solnechnue-batarei\/ja-solar-jap6-270-detail\"><strong>JA Solar JAP6-60-270 <\/strong> <\/a>with a total capacity of 74.52 kW were installed.<\/p>\n<p><strong>Functions of the Alteco Group company:<\/strong> Design, delivery, partial installation, commissioning, warranty.<\/p>\n<p><strong>Result:<\/strong> A solar station with a capacity of 74.5 kW was put into operation. The payback period of the project is 5 years.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20387\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/solar-construction-1.jpg\" alt=\"solar construction 1\" width=\"310\" height=\"250\" title=\"Solar power plant 74,5 kW\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/solar-construction-1.jpg 310w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/solar-construction-1-300x242.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 310px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20388\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/solar-construction-2.jpg\" alt=\"solar construction 2\" width=\"190\" height=\"250\" title=\"Solar power plant 74,5 kW\"><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20389\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/solar-construction-3.jpg\" alt=\"solar construction 3\" width=\"180\" height=\"250\" title=\"Solar power plant 74,5 kW\"><\/p>\n<p><span>solar module mounting structure<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20390\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/solar-inverter-1.jpg\" alt=\"solar inverter 1\" width=\"345\" height=\"250\" title=\"Grid inverter 30 kW\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/solar-inverter-1.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/solar-inverter-1-300x217.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20391\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/solar-inverter-2.jpg\" alt=\"solar inverter 2\" width=\"345\" height=\"250\" title=\"Grid inverter 30 kW\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/solar-inverter-2.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/06\/solar-inverter-2-300x217.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><\/p>\n<p><span>grid inverter 30 kW<\/span><\/p>\n","protected":false},"featured_media":20384,"parent":140261,"menu_order":38,"template":"","class_list":["post-20758","object","type-object","status-publish","has-post-thumbnail","hentry"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/object\/20758","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/object"}],"about":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/types\/object"}],"up":[{"embeddable":true,"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/object\/140261"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/media\/20384"}],"wp:attachment":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/media?parent=20758"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}