{"id":20760,"date":"2021-04-30T10:30:47","date_gmt":"2021-04-30T07:30:47","guid":{"rendered":"https:\/\/alteco.in.ua\/on-grid-solar-station-22-2-kw-makarivskyi-district-kyiv-region-ukraine-572\/"},"modified":"2023-04-18T17:26:53","modified_gmt":"2023-04-18T14:26:53","slug":"on-grid-solar-station-22-2-kw-makarivskyi-district-kyiv-region-ukraine-572","status":"publish","type":"object","link":"https:\/\/alteco.in.ua\/en\/about-us\/all-projects\/solar-power-engineering\/on-grid-solar-station-22-2-kw-makarivskyi-district-kyiv-region-ukraine-572","title":{"rendered":"On-grid solar station 22.2 kW (Makarivskyi district, Kyiv region, Ukraine)"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\" alignleft size-full wp-image-20323\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-0.jpg\" alt=\"nejilovichi 0\" width=\"345\" height=\"230\" title=\"On-grid solar station 22.2 kW\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-0.jpg 315w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-0-300x200.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><strong>Task:<\/strong> To implement a network solar station with a capacity of 22.2 kW, with the placement of panels on the ground, for the sale of electricity at a &#8220;<a href=\"index.php?option=com_content&amp;view=article&amp;id=315;registration-of-green-tariff&amp;catid=55&amp;lang=en-GB\">green&#8221; tariff<\/a>.<\/p>\n<p><strong>Solution:<\/strong> A three-phase grid inverter <strong>Fronius Symo 20.0-3-M<\/strong> (power 20 kW, with a monitoring module) and polycrystalline solar panels <strong>Abi Solar P260-60<\/strong> (total power 22.26 kW) were installed.<\/p>\n<p><strong>Functions of the Alteco Group company:<\/strong> Design, supply, installation, commissioning, registration of a &#8220;green&#8221; tariff, guarantee.<\/p>\n<p><strong>Result:<\/strong> SPP was put into operation and a &#8220;green&#8221; tariff was issued. The payback period of the project is about 6-7 years.<\/p>\n<p><!--more--><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20324\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-1.jpg\" alt=\"nejilovichi 1\" width=\"345\" height=\"240\" title=\"On-grid solar station 22.2 kW\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-1.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-1-300x209.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><strong><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20325\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-2.jpg\" alt=\"nejilovichi 2\" width=\"345\" height=\"240\" title=\"On-grid solar station 22.2 kW\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-2.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-2-300x209.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><\/strong><\/p>\n<p><strong>Task:<\/strong> To implement a network solar station with a capacity of 20 kW, with the placement of panels on the ground, for the sale of electricity at a &#8220;<a href=\"index.php?option=com_content&amp;view=article&amp;id=315;registration-of-green-tariff&amp;catid=55&amp;lang=en-GB\">green&#8221; tariff<\/a>.<\/p>\n<p><strong>Solution:<\/strong> A three-phase grid inverter <a href=%\"\/product%s\/solnechnue-batarei\/invertory\/setevye-invertory\/fronius-symo-20-detail\"><strong>Fronius Symo 20.0-3-M<\/strong><\/a> (power 20 kW, with a built-in Wi-Fi module for remote monitoring) and a &#8220;field&#8221; of polycrystalline solar panels <a href=%\"\/product%s\/solnechnue-batarei\/solnechnue-batarei\/solnechnaya-batareya-p60260d-detail\"><strong>Abi Solar P260-60<\/strong><\/a> (power 22.26 kW) were installed.<\/p>\n<p><strong>Functions of the Alteco Group company:<\/strong> Design, supply, installation, commissioning, registration of a &#8220;green&#8221; tariff, guarantee.<\/p>\n<p><strong>Result:<\/strong> SPP was put into operation and a &#8220;green&#8221; tariff was issued. The station will generate a total of about 23,000 kWh of clean electricity per year and sell most of it at the &#8220;green&#8221; tariff of 5.9 UAH\/kWh (as of 30.12.2016, the tariff of 2016), which will generate income up to $ 4,800 per year. The payback period of the project is 6-7 years.<\/p>\n<p>You can view the work of the station online at the link:<\/p>\n<p><a href=\"https:\/\/www.solarweb.com\/Home\/GuestLogOn?pvSystemid=445589e8-1d55-452f-a200-b86aff26c6b6\" target=\"_blank\" rel=\"noopener noreferrer\"><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20267\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/Solar-web.jpg\" alt=\"Solar web\" width=\"50\" height=\"50\" title=\"Solar.web\"><\/a><strong><a href=\"https:\/\/www.solarweb.com\/Home\/GuestLogOn?pvSystemid=445589e8-1d55-452f-a200-b86aff26c6b6\" target=\"_blank\" rel=\"noopener noreferrer\">Fronius Solar.web Monitoring<\/a><\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20326\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-3.jpg\" alt=\"nejilovichi 3\" width=\"225\" height=\"305\" title=\"grid inverter 20 kW\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-3.jpg 225w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-3-221x300.jpg 221w\" sizes=\"auto, (max-width: 225px) 100vw, 225px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20327\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-4.jpg\" alt=\"nejilovichi 4\" width=\"465\" height=\"305\" title=\"grid inverter 20 kW\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-4.jpg 465w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-4-300x197.jpg 300w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-4-370x243.jpg 370w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-4-410x269.jpg 410w\" sizes=\"auto, (max-width: 600px) 100vw, 465px\" \/><\/p>\n<p><span>grid inverter 20 kW (3ph)<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20328\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-5.jpg\" alt=\"nejilovichi 5\" width=\"300\" height=\"220\" title=\"On-grid solar station 22.2 kW\"><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20329\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-6.jpg\" alt=\"nejilovichi 6\" width=\"390\" height=\"220\" title=\"On-grid solar station 22.2 kW\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-6.jpg 390w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-6-300x169.jpg 300w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-6-370x209.jpg 370w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-6-270x152.jpg 270w\" sizes=\"auto, (max-width: 600px) 100vw, 390px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20330\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-7.jpg\" alt=\"nejilovichi 7\" width=\"345\" height=\"220\" title=\"On-grid solar station 22.2 kW\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-7.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-7-300x191.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20331\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-8.jpg\" alt=\"nejilovichi 8\" width=\"345\" height=\"220\" title=\"On-grid solar station 22.2 kW\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-8.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/05\/nejilovichi-8-300x191.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><\/p>\n<p><span>station view at different times of the year<\/span><\/p>\n","protected":false},"featured_media":20323,"parent":140261,"menu_order":0,"template":"","class_list":["post-20760","object","type-object","status-publish","has-post-thumbnail","hentry"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/object\/20760","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/object"}],"about":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/types\/object"}],"up":[{"embeddable":true,"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/object\/140261"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/media\/20323"}],"wp:attachment":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/media?parent=20760"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}