{"id":20763,"date":"2021-03-22T20:53:41","date_gmt":"2021-03-22T18:53:41","guid":{"rendered":"https:\/\/alteco.in.ua\/on-grid-solar-station-15-2-kw-kirovograd-region-ukraine-575\/"},"modified":"2024-11-04T12:23:57","modified_gmt":"2024-11-04T10:23:57","slug":"on-grid-solar-station-15-2-kw-kirovograd-region-ukraine-575","status":"publish","type":"object","link":"https:\/\/alteco.in.ua\/en\/about-us\/all-projects\/solar-power-engineering\/on-grid-solar-station-15-2-kw-kirovograd-region-ukraine-575","title":{"rendered":"On-grid solar station 15.2 kW (Kirovograd region, Ukraine)"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-20264 size-full\" title=\"On-grid solar station 15.2 kW\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/aleksandriya-main.jpg\" alt=\"aleksandriya main\" width=\"315\" height=\"220\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/aleksandriya-main.jpg 315w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/aleksandriya-main-300x210.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 315px\" \/><\/p>\n<p><strong>Task:<\/strong> Implement a grid solar station for the sale of generated electricity to the general grid at a &#8220;green&#8221; tariff.<\/p>\n<p><strong>Solution:<\/strong> A network inverter <strong>Fronius SYMO 15.0-3-M<\/strong> (remote monitoring capability) and polycrystalline solar panels <strong>ABi-Solar CL-P60250<\/strong> with a capacity of 10 kW (first stage) were installed, later the power of PV modules was increased to 15.2 kW (second stage).<\/p>\n<p><strong>\u0424\u0443\u043d\u043a\u0446\u0438\u0438 \u043a\u043e\u043c\u043f\u0430\u043d\u0438\u0438 \u0410\u043b\u044c\u0442\u044d\u043a\u043e \u0413\u0440\u0443\u043f:<\/strong> \u041f\u0440\u043e\u0435\u043a\u0442\u0438\u0440\u043e\u0432\u0430\u043d\u0438\u0435, \u043f\u043e\u0441\u0442\u0430\u0432\u043a\u0430, \u043c\u043e\u043d\u0442\u0430\u0436, \u043a\u043e\u043d\u0441\u0443\u043b\u044c\u0442\u0430\u0446\u0438\u0438 \u0432 \u043f\u043e\u0434\u043a\u043b\u044e\u0447\u0435\u043d\u0438\u0438 &#8220;\u0437\u0435\u043b\u0435\u043d\u043e\u0433\u043e&#8221; \u0442\u0430\u0440\u0438\u0444\u0430, \u0433\u0430\u0440\u0430\u043d\u0442\u0438\u044f.<\/p>\n<p><strong>Functions of the Alteco Group company:<\/strong> Design, supply, installation, consultations in connection of the &#8220;green&#8221; tariff, guarantee.<\/p>\n<p><strong>Result:<\/strong> The 1st stage (10 kW) and the 2nd stage (5.2 kW) of the solar station were put into operation. The payback period of the project is 6-7 years.<\/p>\n<p><!--more--><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20265\" title=\"On-grid solar station 15.2 kW\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/aleksandriya-top-1.jpg\" alt=\"aleksandriya top 1\" width=\"345\" height=\"215\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/aleksandriya-top-1.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/aleksandriya-top-1-300x187.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20266\" title=\"On-grid solar station 15.2 kW\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/aleksandriya-top-2.jpg\" alt=\"aleksandriya top 2\" width=\"345\" height=\"215\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/aleksandriya-top-2.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/aleksandriya-top-2-300x187.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><\/p>\n<p><strong>Task:<\/strong> Implement a network solar station for the sale of generated electricity to the general power grid at a &#8220;green&#8221; tariff, with the possibility of a phased increase in the capacity of solar panels up to 15.2 kW.<\/p>\n<p><strong>Solution:<\/strong> The network inverter <strong>Fronius SYMO 15.0-3-M<\/strong>, the 1st stage of polycrystalline solar panels <strong>Abi-Solar CL-P60250<\/strong> with a capacity of 10 kW, was installed. Later, the 2nd stage of 5.2 kW solar modules was put into operation. The inverter has the ability to connect to a PC and the Internet for continuous On-line monitoring and reporting.<\/p>\n<p><strong>Functions of the Alteco Group company:<\/strong> Design, supply, installation, consultations in connection of the &#8220;green&#8221; tariff, guarantee.<\/p>\n<p><strong>Result:<\/strong> The 1st stage of the solar station (10 kW) was put into operation, which will generate about 11,000 kWh of clean electricity per year and sell most of it at a &#8220;green&#8221; tariff of 4.89 UAH\/kWh (as of 12\/29\/2015). After the commissioning of the remaining power of 5.2 kW (2nd stage), the station&#8217;s output will reach about 16,500 kWh per year, which will make it possible to receive income of up to 80,000 UAH. The payback period of the project is 6-7 years. For online monitoring of the system &#8211; the network inverter is connected to the Internet via Wi-Fi.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20268\" title=\"Solar module mounting structure\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-1.jpg\" alt=\"setevaya solnechnaya stanciya 15 kvt kirovogradskaya oblast installation 1\" width=\"235\" height=\"310\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20269\" title=\"Solar module mounting structure\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-2.JPG\" alt=\"setevaya solnechnaya stanciya 15 kvt kirovogradskaya oblast installation 2\" width=\"235\" height=\"310\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-2.JPG 235w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-2-227x300.jpg 227w\" sizes=\"auto, (max-width: 235px) 100vw, 235px\" \/><\/p>\n<p>module mounting structure<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20270\" title=\"Solar module mounting structure\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-3.jpg\" alt=\"setevaya solnechnaya stanciya 15 kvt kirovogradskaya oblast installation 3\" width=\"345\" height=\"259\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-3.jpg 448w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-3-300x225.jpg 300w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-3-370x278.jpg 370w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-3-410x308.jpg 410w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20271\" title=\"Solar module mounting structure\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-4.jpg\" alt=\"setevaya solnechnaya stanciya 15 kvt kirovogradskaya oblast installation 4\" width=\"345\" height=\"259\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-4.jpg 448w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-4-300x225.jpg 300w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-4-370x278.jpg 370w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-4-410x308.jpg 410w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><\/p>\n<p>module mounting structure<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20272\" title=\"On-grid solar station 15.2 kW\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/aleksandriya-installation.jpg\" alt=\"aleksandriya installation\" width=\"345\" height=\"259\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/aleksandriya-installation.jpg 345w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/aleksandriya-installation-300x225.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20273\" title=\"Solar module mounting structure\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-6.jpg\" alt=\"setevaya solnechnaya stanciya 15 kvt kirovogradskaya oblast installation 6\" width=\"345\" height=\"259\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-6.jpg 448w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-6-300x225.jpg 300w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-6-370x278.jpg 370w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-6-410x308.jpg 410w\" sizes=\"auto, (max-width: 600px) 100vw, 345px\" \/><\/p>\n<p>module mounting structure<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20274\" title=\"Network inverter 15 kW\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-8_.jpg\" alt=\"setevaya solnechnaya stanciya 15 kvt kirovogradskaya oblast installation 8 \" width=\"336\" height=\"336\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-8_.jpg 336w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-8_-150x150.jpg 150w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-8_-300x300.jpg 300w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-8_-120x120.jpg 120w\" sizes=\"auto, (max-width: 600px) 100vw, 336px\" \/><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-20275\" title=\"Network inverter 15 kW\" src=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-7.jpg\" alt=\"setevaya solnechnaya stanciya 15 kvt kirovogradskaya oblast installation 7\" width=\"336\" height=\"336\" srcset=\"https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-7.jpg 336w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-7-150x150.jpg 150w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-7-300x300.jpg 300w, https:\/\/alteco.in.ua\/wp-content\/uploads\/2021\/03\/setevaya-solnechnaya-stanciya-15-kvt-kirovogradskaya-oblast-installation-7-120x120.jpg 120w\" sizes=\"auto, (max-width: 600px) 100vw, 336px\" \/><\/p>\n<p>network inverter 15 kW (3ph)<\/p>\n","protected":false},"featured_media":22877,"parent":140261,"menu_order":23,"template":"","class_list":["post-20763","object","type-object","status-publish","has-post-thumbnail","hentry"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/object\/20763","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/object"}],"about":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/types\/object"}],"up":[{"embeddable":true,"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/object\/140261"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/media\/22877"}],"wp:attachment":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/media?parent=20763"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}