{"id":20785,"date":"2016-05-24T16:13:25","date_gmt":"2016-05-24T13:13:25","guid":{"rendered":"https:\/\/alteco.in.ua\/green-tariff-for-legal-entities-583\/"},"modified":"2023-02-02T19:18:36","modified_gmt":"2023-02-02T17:18:36","slug":"green-tariff-for-legal-entities-583","status":"publish","type":"page","link":"https:\/\/alteco.in.ua\/en\/green-tariff-for-legal-entities-583","title":{"rendered":"&#8220;Green&#8221; tariff for legal entities"},"content":{"rendered":"\n<p >Legal entities when working with the &#8220;green&#8221; tariff should pay attention to the following information.<\/p>\n<p >&#8220;Green&#8221; tariff &#8211; a special tariff at which electricity is purchased, produced at power facilities that use alternative energy sources. (<a href=\"http:\/\/zakon3.rada.gov.ua\/laws\/show\/575\/97-%D0%B2%D1%80\">Verkhovna Rada of Ukraine, Law &#8220;On Electric Power Industry&#8221; of 16.10.1997 N 575\/97-VR<\/a>).<\/p>\n<p >Important points of the legislation are the provisions that producers of energy from renewable energy sources have the right to:<\/p>\n<p >1. Guaranteed connection to existing energy networks;<\/p>\n<p >2. Guaranteed purchase by energy supply organizations of all energy produced from renewable sources;<\/p>\n<p >3. Invariance of tariffs at which energy is purchased during their validity.<\/p>\n<p >In accordance with the signed <a href=\"http:\/\/zakon4.rada.gov.ua\/laws\/show\/984_011\/page\">Association Agreement with the EU<\/a> (Article 338, Chapter 1, Section V), Ukraine has undertaken additional commitments on the gradual integration of Ukraine&#8217;s electricity system into the European electricity grid, as well as stimulating the production of energy from renewable energy sources.<\/p>\n<p >As of the beginning of 2019, Ukraine has some of the highest rates in Europe for the &#8220;green&#8221; tariff. The validity of the &#8220;green&#8221; tariff is enshrined in law until 2030.<\/p>\n<p ><span><strong><span >Green tariff rates during the commissioning of SPP, without VAT<\/span><\/strong><\/span><\/p>\n<table border=\"1\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td ><span ><strong>Type of station<\/strong><\/span><\/td>\n<td >\n<p ><strong><span >until 31.12.2019<\/span><\/strong><\/p>\n<\/td>\n<td >\n<p ><strong><span >from 01.01.2020<\/span><\/strong><strong><span >to 31.12.2020<\/span><\/strong><\/p>\n<\/td>\n<td >\n<p ><strong><span >from 01.01.2021<\/span><\/strong><strong><span >to 31.12.2021<\/span><\/strong><\/p>\n<\/td>\n<td >\n<p ><strong><span >from 01.01.2022<\/span><\/strong><strong><span >to 31.12.2022<\/span><\/strong><\/p>\n<\/td>\n<td >\n<p ><strong><span >from 01.01.2023<\/span><\/strong><strong><span >to 31.12.2024<\/span><\/strong><\/p>\n<\/td>\n<td >\n<p ><strong><span >from 01.01.2025<\/span><\/strong><strong><span >to 31.12.2029<\/span><\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\"><span >Rooftop SPP<\/span><\/td>\n<td valign=\"top\">\n<p ><span >0,164EUR per kWh<\/span><\/p>\n<\/td>\n<td valign=\"top\">\n<p ><span >0,123EUR <\/span><span >per kWh<\/span><\/p>\n<\/td>\n<td valign=\"top\">\n<p ><span >0,118EUR per kWh<\/span><\/p>\n<\/td>\n<td valign=\"top\">\n<p ><span >0,115EUR per kWh<\/span><\/p>\n<\/td>\n<td valign=\"top\">\n<p ><span >0,110EUR per kWh<\/span><\/p>\n<\/td>\n<td valign=\"top\">\n<p ><span >0,107EUR per kWh<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\"><span >Ground-mounted SPP<\/span><\/td>\n<td valign=\"top\">\n<p ><span >0,15EUR per kWh<\/span><\/p>\n<\/td>\n<td valign=\"top\">\n<p ><span >0,113EUR per kWh<\/span><\/p>\n<\/td>\n<td valign=\"top\">\n<p ><span >0,109EUR per kWh<\/span><\/p>\n<\/td>\n<td valign=\"top\">\n<p ><span >0,105EUR per kWh<\/span><\/p>\n<\/td>\n<td valign=\"top\">\n<p ><span >0,101EUR per kWh<\/span><\/p>\n<\/td>\n<td valign=\"top\">\n<p ><span >0,097EUR per kWh<br \/>\n<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>Legal entities when working with the &#8220;green&#8221; tariff should pay attention to the following information.&hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"folder":[],"class_list":["post-20785","page","type-page","status-publish","hentry"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/pages\/20785","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/comments?post=20785"}],"version-history":[{"count":0,"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/pages\/20785\/revisions"}],"wp:attachment":[{"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/media?parent=20785"}],"wp:term":[{"taxonomy":"folder","embeddable":true,"href":"https:\/\/alteco.in.ua\/en\/wp-json\/wp\/v2\/folder?post=20785"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}